Opportunity 1
Proposal first drafts from your past bids
You ranked proposals and quotes first. Your best material sits in your proposal library, yet people rebuild it for every RFP, pulling senior engineers off billable work.
Your best material sits in your proposal library, yet people rebuild it for every RFP, pulling senior engineers off billable work.
DRAFT FOR REVIEW. Not sent.
Proposal section, first draft with gaps flagged
District of Harlow Bay, RFP 26-114: Alder Creek culvert replacement
Relevant experience
Our team has designed creek crossing replacements for BC municipalities since 2017. Close matches:
- Mill Creek box culvert, Township of Esker (2023): fish passage, design through construction.
- Birch Road crossing, City of Pell River (2022): replacement under a live collector road.
Flagged For You
- GAP: The RFP wants a hydrotechnical lead with 10 years' experience. The closest CV shows 8.
- GAP: No past bid covers the District's new design flow requirement (RFP 4.3). A project lead writes this.
- CHECK: Confirm Esker and Pell River let you cite these projects, and the "since 2017" date.
- LEFT BLANK: approach, team, hours and fee.