Opportunity 1
Subtrade bids, levelled side by side
Three mechanical bids never price the same scope. Each set of bids is laid out against your scope sheet, with gaps and exclusions flagged, so you compare like with like.
Three mechanical bids never price the same scope.
A bid levelling sheet
BID LEVELLING. Mechanical, [project]
3 bids against your scope sheet. Prices as quoted, plus GST.
Bid 1
- Includes radiant floors, HRV and driveway snowmelt.
- Excludes the pool equipment hookup, which is in your scope.
- Valid for 30 days.
BID 2 (lowest)
- Includes radiant floors and HRV.
- Excludes snowmelt. Commissioning isn't mentioned.
- Boiler lead time: 10 weeks.
BID 3 (highest)
- Includes everything on the scope sheet.
- Adds an alternate: air-to-water heat pump, priced separately.
Gaps to close before you compare
- Ask bidder 2 to price snowmelt and confirm commissioning.
- Ask bidder 1 to price the pool hookup.
- WorkSafeBC clearance letters: on file for bidders 1 and 3. Bidder 2: requested.
No ranking given. Who gets the work is yours.