Prepared for review · fictional records
Alder Row Dental · Willow Creek clinic signage
- Prepared for
- Owner, before Friday’s reply
- Built from
- W1, C1, R1, R2
- Status
- Review copy · nothing sent
- Next touch
- Reply to Priya M.
The likely need
A fourth clinic that opens in seven weeks, looks like the other three and opens on time. The buying pressure is the date, not the price: the previous supplier missed clinic three’s opening [C1].
The full scope (illuminated fascia, six-room wayfinding, window vinyl) will very likely exceed Priya’s 5,000 approval limit, so Dr. Hallam is part of this decision even though we have not met him [C1, R2].
What we know, and where it comes from
| What we know | Source |
|---|
| Fourth clinic in a strip plaza; opens seven weeks from the call | C1, W1 |
| Exterior sign needs the landlord’s approval | C1 |
| Wants a fascia sign matching the three existing clinics (blue on white, illuminated), wayfinding for six rooms, window hours vinyl | C1, W1 |
| Priya approves under 5,000; Dr. Hallam approves above | C1 |
| Last supplier took eleven weeks and missed an opening | C1 |
| Referred by the plaza’s property manager, Tom D. | R1 |
| Our similar job: six weeks from approval to install, three of them waiting on the permit; band 7,800 to 9,600 before tax | R2 |
What we still need to learn before quoting
- Has the landlord issued sign criteria or an approval letter? We cannot apply for the permit without it, and the permit is the longest step [R2].
- Has anyone applied for the permit yet? If not, seven weeks works only if the application goes in within the next week.
- Are the interior drawings final? Room names and door positions decide how many wayfinding signs there are.
- Does “match the other clinics” mean the original fabricator’s specification or a visual match? That changes cost and lead time.
- When does Dr. Hallam want to see the quote, and does he want it directly from us or through Priya?
Timing, worked back from opening day
| Step | Depends on | Latest start |
|---|
| Site measure and landlord approval letter | Priya, landlord | This week |
| Quote approved | Dr. Hallam | Week 1 |
| Permit application (about three weeks to grant) | Landlord letter | Week 1 |
| Fabrication (about two weeks) | Permit granted | Weeks 4 to 5 |
| Install (one day) | Site ready | Week 6 |
| Clinic opens | | Week 7 |
Recommended next step
Offer a 30-minute site measure this week instead of a quote by Friday. A quote before a measure is a guess we would redo [R2], and a measure is the first real date Priya gets. Send the two dental photos she asked for, and give the past-job price band now so Dr. Hallam is involved early rather than at the end.
Reply to Priya M. · draft for approval
- To
- Priya M., practice manager
- Subject
- Willow Creek signage: protecting your opening date
- Attach
- Two dental clinic photos from our job records
Thanks for the call today. You said the last supplier missed clinic three’s opening, so here is how we would protect your date.
Two things move fastest if we do them this week: a 30-minute site measure at Willow Creek, and the landlord’s written sign approval, which we need before we can apply for the permit. On our last similar job in that municipality, the permit took about three weeks, and it was the longest step.
On similar clinic work, an illuminated fascia plus interior wayfinding has landed between 7,800 and 9,600 before tax; the window vinyl would be extra. Your quote will follow the measure, so it is based on real dimensions rather than a guess.
Two photos of recent dental clinic signs are attached. Could you send the interior drawings, and let me know which morning this week works for the measure?
Before this goes out
- Confirm the 7,800 to 9,600 band still holds for this scope.
- Pick the morning you can do the measure; the email should name it.
- Decide whether to copy Dr. Hallam now, since the scope will pass Priya’s limit.
- Add a CRM task: chase the landlord letter if it has not arrived by the measure.